Wow! Long time, no blog! I've been following everyone's updates, but I haven't had the time to sit down and write something. Life just has a way of getting in the way.
As of right now, all plumbing is "roughed-in", bathtubs/shower tray things are installed, electric/cable is done, roof is done...etc. Our siding has been sitting in the front (covered) for a while now. Missing garage service door and window have been installed.
Tomorrow, (Wednesday), is our pre-drywall meeting! I can't believe it. Tomorrow marks 6 weeks since groundbreaking. I'm hoping when we get back to town next Saturday the 13th, the house will be all drywalled!
I received a letter from RH today...
our pre-settlement walkthrough is October 23rd and we close on October 28th!! Not ecstatic about the days (closing on a Monday!) but I'm glad it's in sight. Time to reschedule the refrigerator delivery!
Enjoy the pictures!
|
Me posing in the middle of Home Depot with our new fridge! It's the GE 25.3 model, this is the one recommended for the Palermo appliance package we got. |
|
This is us posing in our new mirror. I legit just found out about TJ Maxx/Marshall's...this was a find at TJ Maxx! I'm thinking it will look good somewhere in the foyer....and I'll be spending a lot of money at TJ Maxx soon. |
|
On the morning room floor...I thought it was funny :) |
|
It's electric! |
|
Uhhhhbsesssed with the recessed lights on the porch!! |
|
Random HVAC stuff |
|
Upstairs guest bathtub |
|
HOUSE!! |
No comments:
Post a Comment