Two big pieces of news today: We broke ground and we locked in our rate at 4.375%! Not as great as 3.5% in May like we were originally quoted, but much better than the 4.5% we were given on July 5th. Still looking to close in late October, so this was a 120-day extended lock-in.
We were able to swing by the lot during my lunch break to find our hole! Looks like they are digging for footers. We are about 2 weeks behind a home across the street, they have their crawl space and garage poured with lumber just sitting around. Enjoy the pictures of dirt!
|
Panorama from our "side yard" |
|
From the front |
|
Our sign is still pretty! That won't last. |
|
Dirt hill! |
|
Panorama from the corner of our street and the alley street. This little alley way will be nice for parking when we entertain. |